Skip to the content
logo mainlogo darklogo light
  • About Us
  • Portfolio
  • ESG
  • Our Team
  • News
  • Contact Us
logo main
  • About Us
  • Portfolio
  • ESG
  • Our Team
  • News
  • Contact Us
logo main
  • About Us
  • Portfolio
  • ESG
  • Our Team
  • News
  • Contact Us
Date:

2023

Category:
Solar
Location:
Townsville, Queensland
Project Status:
Operating
Maximum Capacity:
116 MW
Number of Solar Panels:
413,280
Website:
rossriversolarfarm.com.au/
Tags:

Ross River Solar Farm

Recognising the site’s abundant sunlight and proximity to urban areas where sustainable, renewable electricity was needed, the project’s developers applied to deliver Townsville’s first large scale solar development.

Townsville City Council granted development approval for Ross River Solar Farm in June 2016.
In late 2016, it was announced specialist infrastructure managers, Palisade Investment Partners, had become joint owners and project investors in the Ross River Solar Farm project. Palisade then led the process of securing financial close for the solar farm in the second quarter of 2017. In February 2018 Palisade acquired 100% of the solar farm.

Ross River Solar Farm has been built on a 202 hectare site that was historically a disused mango farm.  The solar farm is ‘utility scale’ and has the capacity to generate 116 megawatts of clean renewable energy – enough to power over 54,000 homes.

Solar farms use solar panels to capture the energy from sunlight.  Ross River Solar Farm has 413,280 solar panels installed on single axis tracking systems that allow its panels to rotate and capture the maximum amount of sunlight.  Each of the farm’s crystalline solar photovoltaic panels are identical in type but larger in size to those used on household rooftops throughout Australia.

To reduce the visual appearance of the farm, vegetation buffers have been planted at either end of the site.

The site entrance is off Kelso Drive and an operations building and small car park has been established to accommodate onsite staff.

Ross River Solar Farm is expected to operate for up to 40 years.  After this time, the plant will either be refurbished for further use or fully decommissioned, with the site returned to its natural condition.

Intera Renewables is the manager of long-term investments in infrastructure assets across Australia. We recognise that the assets we manage are built on land of which the Traditional Custodians are the Aboriginal and Torres Strait Islander peoples.
Intera Renewables recognises the Traditional Custodians' continuing connection to the land, waters and culture. Intera Renewables pays its respects to elders past, present and future.

ABOUT US

PORTFOLIO

ESG

CONTACT US

© 2023

No posts were found for provided query parameters.